Studio journal

The Field

For building better spaces.

Notes from the work around the work: recent events, site observations, guides, and the detail decisions behind carpentry, millwork, electrical coordination, lighting design, materials, and interior delivery.

Explore the journal

What the Site Teaches / Architecture

Orientation Is the Cheapest Cooling System

Before a single machine is purchased, a building's orientation has already decided most of its thermal life. In a hot-humid climate like Bengal's, the working rules are old and unglamorous: keep the long faces toward north and south,...

01

The Better Brief / Healthcare

What a Diagnostic Centre Must Resolve Before the Machines Arrive

A diagnostic centre's interior succeeds or fails on decisions made before any equipment is unboxed: how samples move without crossing patients, which rooms need radiation shielding and regulatory clearance, where uninterrupted power...

02

Material in Context / Facade

ACP, HPL, or Stone: Facade Materials in Kolkata's Weather

There is no best facade material — there is a best material for a given face of a given building, chosen for how it handles four things Kolkata guarantees: driving monsoon rain, months of high humidity, hard summer sun, and airborne...

03

What the Site Teaches / Architecture

Building on Kolkata Soil: Why Foundations Here Are Different

Kolkata is built on what the river left behind: deep layers of soft, water-laden clay and silt, with the water table close enough to the surface that most excavations meet it quickly. This ground carries buildings differently from the...

04

What the Site Teaches / Landscape

Planting for Both Monsoon and May

A landscape in Kolkata is designed for two opposite failures: roots drowning in July and beds baking in May. The plant list, which gets most of the attention, is actually the third decision. First comes water — where every drop of...

05

The Better Brief / Residential / Heritage

Renovating a North Kolkata House: What the Old Walls Need

An old North Kolkata house is not a flat with more history — it is a different construction system with its own rules. The walls are load-bearing brick in lime mortar, not a frame with infill; the plaster breathes; the floors may ride...

06

The Better Brief / Workplace

Before the Fit-Out: How to Brief Your Office

An office fit-out budget behaves better when it is thought of per seat rather than per square foot, because the seat carries everything the square foot hides: the workstation, its share of meeting rooms, services, storage, and...

07

The Better Brief / Residential

Getting a Home Ready Before Pujo: What's Realistic in Eight Weeks

Eight weeks before Pujo is enough time to transform how a home feels — and not enough time to transform what it is. Painting, polish refresh, lighting improvements, soft furnishing, deep repairs to one problem area: these fit, done in...

08

Detail Register / Healthcare

The X-ray Room: Shielding, Approvals, and the Door

An X-ray room is the one room in a diagnostic fit-out that is legally a different kind of construction. Its walls carry radiation shielding — lead lining or barium-plastered masonry to specified equivalences; its layout requires...

09